Neta acceptance testing specifications

Performing necessary work 7. All electrical equipment that is appropriate for EPM should be inspected, tested, and serviced in accordance with an EPM program. Records of all inspections, tests, and servicing should be documented and reviewed.

Uploader: Tojat
Date Added: 19 July 2018
File Size: 46.85 Mb
Operating Systems: Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X
Downloads: 51695
Price: Free* [*Free Regsitration Required]





This includes planning, identifying the main parts, and utilizing available support services for a program. GFPE systems equipped with or without a test panel shall be inspected and tested at installation and at specified intervals as recommended by the manufacturer. A ground fault sensor window can be used to encircle all service conductors, including the grounded conductor neutral.

Visual Inspection Intervals for Power Cables 7. Cleaning Interval for Lighting Equipment Records of all inspections, tests, and servicing should be documented and reviewed. Frequency of Maintenance for Switchgear Assemblies 4. Prescribing corrective adceptance 6.

Ground-fault protective devices are intended to protect personnel and equipment. ANSI-C2, National Electrical Safety Code An EPM program is defined as the system that manages the conducting of routine inspections and tests and the servicing of electrical equipment so that impending troubles can be detected and reduced specificatoins eliminated.

NETA Acceptance Testing

Inspections, tests, and servicing shall be performed by personnel who are qualified for the work to be performed. Frequency for Cable Tray System. NFPA 70B includes designing to accommodate maintenance, scheduling maintenance, personnel and equipment safety, circuit protection, and initial acceptwnce testing. All electrical equipment that is appropriate for EPM should be inspected, tested, and serviced in accordance with an EPM program. If an EPM program does not exist, an inspection, testing, and servicing sppecifications should be developed and implemented to establish a baseline to initiate an Teating program.

Performing routine inspections and tests 4. Performing necessary work 7. A system of recording changes in electrical systems and then integrating those changes into the applicable drawings should be developed and implemented. Frequency for Rotating Equipment These qualifications can be shown by appropriate documentation of work experience, on-the-job, and offsite formal training to verify understanding and retention of minimum knowledge, skills, and abilities.

Surveying and analyzing equipment maintenance requirements 3. An EPM program is defined as the system that manages the conducting of routine inspections and tests and the servicing of electrical equipment so that impending troubles can be detected and reduced or eliminated.

Where designers, installers, sepcifications constructors specify, install, and construct equipment with optional auxiliary equipment, that optional equipment should be part of the EPM program. Chapter 6 includes surveying the existing electrical system installation, identifying crucial equipment, establishing a systematic program to follow, and developing acceptxnce and procedures to plan, analyze, perform, verify, and record.

Electrical drawings should be kept current.

NETA Acceptance Testing

Analyzing inspection and test reports 5. Assigning qualified personnel 2.

We offer electrical maintenance which complies with the NETA acceptance standards for testing and maintenance. An initial period of inspection sometimes several years provides sufficient knowledge that, when accumulated, may permit increasing or decreasing that interval based upon documented observations and experience.

An EPM program should be developed and implemented based on the requirements of: Recommended Frequency for Substations 3.

1 thoughts on “Neta acceptance testing specifications”